Frisco
July 4, 2025 Maverick Tax Guardians

After a prolonged closure lasting 18 months, the Jackson Road bridge in Colleyville has officially reopened to traffic, marking the completion of a major infrastructure project aimed at improving local transportation and safety.

The bridge, located between Riverwalk Drive and Oak Knoll Drive, had been closed since early 2023 to allow for a complete rebuild. The project involved replacing the aging bridge structure, updating utilities, and enhancing surrounding roadways to better serve both residential and commuter traffic.

Project Timeline and Scope

The reconstruction effort began in January 2023 and faced several delays due to weather conditions, utility coordination, and supply chain challenges. Despite these setbacks, city officials emphasized that the project remained a top priority due to its strategic location and importance for community access.

Work on the bridge included:

  • A full demolition and rebuild of the previous structure
  • Installation of updated drainage systems and utility lines
  • Widening to allow for improved traffic flow
  • Enhanced pedestrian pathways and safety railings

Importance of the Bridge to Colleyville

The Jackson Road bridge is a heavily used connector for residents traveling between neighborhoods, schools, and major roads like Colleyville Boulevard (FM 26). Its closure caused lengthy detours and increased pressure on alternate routes.

Now that it’s open, commuters can expect:

  • Shorter travel times
  • Improved traffic circulation
  • Reduced congestion on nearby streets
  • Safer routes for pedestrians and cyclists

City officials and community members gathered for a ribbon-cutting ceremony to celebrate the completion of the project and the return of a vital corridor.

💬 What Local Leaders Are Saying

“This bridge is more than just concrete and steel it’s a connection between neighborhoods and an investment in our city’s future,” said Colleyville Mayor Richard Newton. “We’re grateful for the patience of our residents and proud of the result.”

Public Works staff added that the upgrades made during the rebuild will extend the life of the bridge and help accommodate future growth in the area.

Looking Ahead

The city of Colleyville continues to invest in infrastructure improvements, with upcoming road and drainage projects also on the calendar. The successful completion of the Jackson Road bridge demonstrates the city’s commitment to long-term planning, safety, and mobility for residents and visitors alike.

Source
This news article is based on information from
Community Impact – ”Jackson Road Bridge opens in Colleyville after 18 months of construction”( July 2, 2025) Retrieved fromhttps://communityimpact.com/dallas-fort-worth/grapevine-colleyville-southlake/transportation/2025/07/02/jackson-road-bridge-opens-in-colleyville-after-18-months-of-construction/